Temporary Dog Weather Shelter
When the summer season rolls around, those dogs that are outside do need to have proper shelter to protect them against the heat, or rainy weather. In the UK, and especially Wales our weather can change very quickly and whether it’s blazing sunshine or rain showers, if you have a sled dog or in fact any dog breed then it’s important to recognise that they need adequate shelter. If you are on a day trip, perhaps away on a camping or caravanning holiday, or even simply a day out at a fun dog show all dogs need shelter. It’s a must to help avoid heatstroke, sunburn, or a wet uncomfortable coat
We can highly recommend the Turners K9 Weather Shelter, and its ingenious design that allows you to move the cover as the sun passes though during the day to keep your dogs in the shade is fantastic. No longer do you have to use a gazebo and go to all that work of erecting it, putting sides on, taking sides of as you are trying your best to keep your dogs shaded. It’s a timesaving product that actually works.
Take a look at the photos and the prices are very reasonable, especially when you think about how expensive it is to replace a whole gazebo frame as the wind bent and buckled it. No more needing quite a few people to pull together if you have a quick set up gazebo, no just push a few poles in the ground and slid the covering over, push the other end of the poles in and your dog shelter is up!
This is the 8m kit as shown in our photos and as tested
Comprising
1 × 9m 600 denier pvc coated polyester cover
(8m shelter with 500mm side flaps)
9 × 4m 8.5mm fiberglass flexi poles
18 soft ground sockets
12 × Ground pegs
2 spacer webbing 8m long
1 × Large cotton carry bag
1 × Small peg / socket bag
Guy Ropes
The shelter stands 1.2 m high when spaced at 2.5 wide Approx
The Cover may fade if left out for long periods of time
6 Month warranty that covers manufacturing faults.
Warranty doesn't cover poles and guy ropes or general wear and tear
This item is designed for using on soft / firm ground as the the support tubes are sunk into the ground (Rubber hammer required not supplied)